39399 Search Results found

Power

Power |

Coal

Coal |

Oil & Gas

Oil & Gas |

Upstream

Upstream |

Renewable Energy

Renewable Energy |

Road

Road |

News

News |

Database

Database |

Subscribe

Subscribe







subscribe
subscribe
infraline

Report on Equitable Sharing of Benefits Rising from Coal Mining and Power Generation among Resource Rich States

Report on Equitable Sharing of Benefits Rising from Coal Mining and Power Generation among Resource Rich States (May 2014) .....

Jul 09, 2014


subscribe
subscribe
infraline

NH-73_EIA

The project road is Rehabilitation and upgrading of existing 2-lane to 4-laning of Chutmalpur­Ganeshpur section of NH-72A & Roorkee-Chutmalpur-Saharanpur-UP/Haryana Border section of NH-73 in the states of Uttar Pradesh and Uttarakhand". This sectio.....

Jun 17, 2014


subscribe
subscribe
infraline

Notification dated 6th November, 2013 of Administrator of Daman & Diu and Dadra & Nagar Haveli, illegal construction attempted on land of applicant and order dated 27.03.2014

Joint Electricity Regulatory Commission (JERC) (For the State of Goa and Union Territories) For FY 2014-15 .....

Jun 03, 2014


subscribe
subscribe
infraline

Order on seeking direction of the Commission for removal of the difficulty faced in the absence of prescribed procedure or protocols for approval of drawings, documents, metering, scheme etc. (22.05.14)

General Orders of Orisa Regulatory Electricity Commission For FY 2014-15 .....

May 26, 2014


subscribe
subscribe
infraline

Order on notification dated 6th November, 2013 of Administrator of Daman & Diu and Dadra & Nagar Haveli, illegal construction attempted on land of applicant. (05.05.14)

Joint Electricity Regulatory Commission (JERC) (For the State of Goa and Union Territories) For FY 2014-15 .....

May 23, 2014


subscribe
subscribe
infraline

Order on Determination of generic levellised generation tariff for the FY 2014-15 under Regulation 8 of the CERC Regulations

Tariff Orders of Central Electricity Regulatory Commission (CERC) for FY 2014-15.....

May 23, 2014


subscribe
subscribe
infraline

Order on Revision of tariff of Anta Gas Power Station (419.33 MW) for the period from 1.4.2009 to 31.3.2014 NTPC Ltd

Tariff Orders of Central Electricity Regulatory Commission (CERC) for FY 2014-15.....

May 23, 2014


subscribe
subscribe
infraline

Guidelines on vetting of revised cost estimates for Hydro Electric projects: CEA forwards draft to MoP

  • After making the required modifications, the CEA has submitted the draft guidelines on vetting of revised cost estimates for Hydro Electric projects to the Power Ministry.

  • May 22, 2014


subscribe
subscribe
infraline

Transmission Tariff order for the period FY2014-15 TO FY2018-19 (09.05.14)

Tariff Orders of Andhra Pradesh Electricity Regulatory Commission (APERC) 2014-15 .....

May 12, 2014


subscribe
subscribe
infraline

Information on Procedure for Vetting of Revised Cost Estimates for HE Projects (March 2014)

A meeting held on March 27, 2014 in Ministry of Power (MOP) to discuss the procedure for vetting of Revised Cost Estimates (RCEs), it was desired that CEA would provide certain information in respect of RCEs, like checklist, flow chart etc. The desi.....

Apr 21, 2014


1 2 3 4 5  ...