Greetings!
Infraline is pleased to announce the release of its third report in the Power Project Report Series - 'Report on Proposed Thermal Power Projects (2009)'. The report is an effort to showcase some of these thermal power projects, which are at initial stage and/or are under various stages of regulatory clearances. The report further analyses some important trends mentioned below:
About 50% projects based on Super Critical technology: Out of the 76,198 MW being proposed and detailed in this report, about half of the capacity is through the super-critical technology clearly indicating a move towards more efficient and environment friendly technology.
About 90% capacity of 1000 MW and more: About 90% of the proposed capacity to come from projects with an installed capacity of 1,000 MW and more demonstrating a shift to large installed capacities in order to reap economies of scale as well as to gain incentives from the government policies encouraging mega capacities.
About one third capacity based on blended/imported coal: More than 65% of the proposed capacity from projects with indigenous coal as a fuel and more than 32% from blended or imported coal.
About three per cent capacity based on gas as fuel.
The 200 page Report comprehensively covers details on 58 Proposed Thermal Power Projects in 13 states across India.
Promoter
Location (District/Village/Taluk/State, Latitudes/Longitudes)
Infrastructure Details (Nearest Town/Port/Airport/Railway/Highway, Distance from state boundary)
Installed capacity and Unit configuration
Fuel and Fuel Requirement / Source
Land Requirement
Water Requirement/Source
Estimated cost
Expected Commissioning date
Key Regulatory Clearances viz. Consent for establishment of plant from State Government, Environment clearance, Land Acquisition, Water Clearance, Stack Height
Project Background with Project Location images/maps
Land Requirement/Use Break-up and Site Comparison
Estimated Water Requirement (Break-up)
Fuel Specifications
Flue Gas Emission
Fly Ash Utilization
Solid Waste Management
R&R
Barge Route / Drainage / Monitoring Stations
Expected Pollutants and Control measures
Developer's Contact Details
InfralineEnergy Research Team conducted an extensive survey over a period of eight months to finally come up with this report keeping in mind the interest of the following stakeholders:
Power Project Developers
Power Equipment Manufacturers
Banks, Project Financers and Investment Bankers
Consultants
Regulatory Bodies
Infrastructure Developers and Financers
Transmission and Distribution Companies
Power Traders
Coal Mining Companies
Coal Traders
____________________________________________________________________________________________________________
For complete Executive Summary and details on
pricing, please click
here
To purchase the report, please write to
nasir@infraline.com
or call 91 98113 79641
____________________________________________________________________________________________________________
Note: Infraline would bring out a second issue of this report with more proposed power projects by the end of the year.