Request you to kindly drop in all your mails/queries to support@infraline.com or call us at
+91-120-6799125 (D); +91-120-6799100 (B)

infra-search

User Name

Password

Forgot Password?


Set as Default

Preparation of Detailed Feasibility Report (DFR) for installation of 3x800 MW TPP at GGSSTP in Ropar, Punjab by phasing out the existing 6x210 MW units

Punjab State Power Corporation Ltd. (PSPCL) has invited bids for preparation of Detailed Feasibility Report (DFR) for installation of 3x800 MW Coal based Super Critical Units at Guru Gobind Singh Super Thermal Power Plant (GGSSTP) in Ropar, Punjab by phasing out the existing 6x210 MW units. The last date for submission of bid is 29.09.2017 upto 10:30 A.M and the bids shall be opened on 29.09.2017 at 11:00 A.M. The 1260 MW GGSSTP Thermal Power Plant had its first unit commissioned in September 1984, second in March 1985, third and fourth in the year 1988-89 and the last two in the year 1992-93. The existing units are past their 25-year life. Unlike a conventional coal-fired thermal plant,.....

Registered user use 'Login Manager' (Download) or 'Login Button' on upper right corner as the case may be (Explain?)  
 
Email Id/Login Name :