Request you to kindly drop in all your mails/queries to support@infraline.com or call us at
+91-120-6799125 (D); +91-120-6799100 (B)

Odisha: Water worry for farm, power sectors

Farmers of Kalahandi district are worried over inadequate release of water from the right and left canals of Indravati reservoir for kharif cultivation. Worse, water is not reaching the tail end of the canals. Similarly, not enough power is being generated from the project in the absence of water. Power generation capacity of Indravati project should be 600 MW during the peak period of water release but now, only 100 MW is being generated by the hydro-power division of the project. After power generation, water is released through power channel to Mangalpur barrage over river Hati. From there, water is released into left and right canals for irrigation and surplus water is stocked in the river.For the current kharif season, the Agriculture .....

Registered user use 'Login Manager' (Download) or 'Login Button' on upper right corner as the case may be (Explain?)  
 
Email Id/Login Name :