Project Status & Background of Tadadi Combined Cycle Power PlantKarnataka Power Corporation
Limited (KPCL) is developing a 3 blocks of 700 MW (Combination of 2 GTGs + 2
HRSGs + 1 STG per block) totaling to 2100 MW capacity located at Tadadi, 47 km
from Karwar along the National Highway-17, Karnataka. Water source is sea water.
Fuel requirement is 2.66 MMTPA at 95% PLF. Land requirement is 600 acres. PPA
entered with ESCOM's on December 18, 2010. The cost of the project is INR 8000
Crore.
Status [August 2012]
No updates available.
Status [May 2012]
No updates available.
Status [March
2011]
Consultancy
services taken for comprehensive study for developing functional specifications
for LNG import terminal engaged. A final decision on the gas linkage will be
taken up after the studies are completed.
TOR in
respect of the Project obtained on 10-8-2010.
Environment
Studies are in progress.