|
|
|
|
Costing of HEPs in Bhutan (Mar 2013)
|
|
The document contains the details of the cost estimates of various ongoing and proposed HEPs in Bhutan, including the cost of associated transmission system. In some of the HEPs, the cost of associated transmission system seems to be high, constitut.....
|
|
May 13, 2013
|
|
|
|
|
|
Costing of HEPs in Bhutan (Mar 2013)
|
|
The document contains the details of the cost estimates of various ongoing and proposed HEPs in Bhutan, including the cost of associated transmission system. In some of the HEPs, the cost of associated transmission system seems to be high, constitut.....
|
|
May 13, 2013
|
|
|
|
|
|
Status of Development of Hydro Power Potential - Feb 2013
|
|
According to the re-assessment of hydro-electric potential of the country, carried out by Central Electricity Authority (CEA) in 1987, the hydro power potential of the country in terms of Installed capacity (IC) is estimated at 148701 MW, out of whi.....
|
|
Mar 14, 2013
|
|
|
|
|
|
Orissa - Hydro Power Projects
|
|
This document includes a list of 9 Hydro power projects in the state of Orissa under Private sector. The projects are under various stages of execution, viz, operational, under-construction and proposed stages.
.....
|
|
Jan 28, 2013
|
|
|
|
|
|
Orissa - Hydro Power Projects
|
|
This document includes a list of 9 Hydro power projects in the state of Orissa under Private sector. The projects are under various stages of execution, viz, operational, under-construction and proposed stages.
.....
|
|
Jan 28, 2013
|
|
|
|
|
|
Status of International Hydro Projects of NHPC - Dec 2012
|
|
The status of various international hydro power project being implemented by NHPC is given in the document. The countries where these projects are under development are Nepal, Bhutan and Myanmar. In Nepal, the total capacity under development is 100.....
|
|
Dec 13, 2012
|
|
|
|
|