Draft Recommendations of Hydro Sub-Group for Revitalizing Hydro Power Investments (May 2013)

Hydro capacity is not a natural choice considering high capital costs, longer gestation period, higher risks in implementation (both pre-development and construction). Accordingly, no State has come forward and initiated any bids for Hydro. This has.....

May 21, 2013


subscribe
subscribe
infraline

Costing of HEPs in Bhutan (Mar 2013)

The document contains the details of the cost estimates of various ongoing and proposed HEPs in Bhutan, including the cost of associated transmission system. In some of the HEPs, the cost of associated transmission system seems to be high, constitut.....

May 13, 2013


subscribe
subscribe
infraline

Costing of HEPs in Bhutan (Mar 2013)

The document contains the details of the cost estimates of various ongoing and proposed HEPs in Bhutan, including the cost of associated transmission system. In some of the HEPs, the cost of associated transmission system seems to be high, constitut.....

May 13, 2013


subscribe
subscribe
infraline

Status of Development of Hydro Power Potential - Feb 2013

According to the re-assessment of hydro-electric potential of the country, carried out by Central Electricity Authority (CEA) in 1987, the hydro power potential of the country in terms of Installed capacity (IC) is estimated at 148701 MW, out of whi.....

Mar 14, 2013


subscribe
subscribe
infraline

Orissa - Hydro Power Projects

This document includes a list of 9 Hydro power projects in the state of Orissa under Private sector. The projects are under various stages of execution, viz, operational, under-construction and proposed stages. .....

Jan 28, 2013


subscribe
subscribe
infraline

Orissa - Hydro Power Projects

This document includes a list of 9 Hydro power projects in the state of Orissa under Private sector. The projects are under various stages of execution, viz, operational, under-construction and proposed stages. .....

Jan 28, 2013


subscribe
subscribe
infraline

Note on Infrastructural Challenges for Demwe Lower Hydro Power Project - Jan 2013

Demwe Lower HEP (1750 MW) is being implemented by Athena Demwe Power Limited in Joint sector with the Government of Arunachal Pradesh on BOOT basis. The Project is located in Lohit district of Arunachal Pradesh and is at a very advanced stage of com.....

Jan 15, 2013


subscribe
subscribe
infraline

Status of International Hydro Projects of NHPC - Dec 2012

The status of various international hydro power project being implemented by NHPC is given in the document. The countries where these projects are under development are Nepal, Bhutan and Myanmar. In Nepal, the total capacity under development is 100.....

Dec 13, 2012


subscribe
subscribe
infraline

MoP's consultant G N Mathur's blueprint to overcome hurdles in hydro projects

Oct 09, 2012


subscribe
subscribe
infraline

MoP's consultant G N Mathur's blueprint to overcome hurdles in hydro projects

Oct 09, 2012