Mangdechhu Hydroelectric Project (4x180=720MW) in Bhutan (to be developed by NHPC) A meeting was taken by Member (Hydro), CEA on 19.02.2009 with NHPC, CWC and GSI to review the progress of appraisal of DPR (Detailed Project Report) of Mangdechhu Hydro Electric Project. Following aspects were discussed in the meeting regarding the development of project. Hydrology: It was informed that hydrology for carrying out Power Potential Studies has been examined by CWC and comments/observations sent to NHPC. The comments mainly pertain to sedimentation rate, IMD storm study, assessment of snow melt contribution to PMF and the detailed calculation of PMF. CE (HPA) mentioned that in their observations, HSO of CWC have commented......