.. Security Constrained Economic Dispatch In Power Sector – A Step Closer To Optimization
Request you to kindly drop in all your mails/queries to support@infraline.com or call us at
+91-120-6799125 (D); +91-120-6799100 (B)

infra-search

User Name

Password

Forgot Password?


Set as Default

Database

02 Aug 2019

Summary

  • The Ministry of Power (MoP) had issued guidelines on Flexibility in Generation and Scheduling of Thermal Power Stations. It aimed to utilize un-dispatched surplus of cheaper generating stations in order to reduce power generation cost. Likewise, Power System Operation Corporation Limited (POSOCO) proposed procedures for a pilot project and circulated a consultation paper on Security Constrained Economic Dispatch of ISGS PAN India that envisaged an optimization technique of power generation at inter-state level. SCED appears as an excellent mechanism to achieve the objectives laid down my Ministry of Power beside numerous advantages.

......

Registered user use 'Login Manager' (Download) or 'Login Button' on upper right corner as the case may be (Explain?)  
 
Email Id/Login Name :