Summary
Prime Minister Narendra Modi today dedicated to the nation three hydro-electric projects (HEPs) with a generating capacity of 1,732 MW in Himachal Pradesh.
All the three power projects -- Koldam HEP (4x200 MW) of NTPC, Parbati HEP Stage-III (4x130 MW) of NHPC and Rampur HEP (6x68.67 MW) of SJVN -- are equipped with generating equipment supplied and commissioned by Bharat Heavy Electricals Limited (BHEL), state-owned BHEL said in a statement today.
Himachal Pradesh Governor Acharya Devvrat, Chief Minister Virbhadra Singh, Union Health Minister J P Nadda and Power Minister Piyush Goyal were present on the occasion.
BHEL has a vast experience in hydro-......