Summary
The ongoing 4-lane road construction at NH 29 has allegedly disrupted vehicular traffic cutting off Kohima-Dimapur link, after a landslide occurred near Chumoukedima police check gate. While no casualty has been reported, over 100 vehicles are stranded due to the landslide.
Speaking with EastMojo, additional deputy commissioner of police and PRO Relo Aye, confirmed that over 100 metres of the stretch was affected by the landslide which was caused due to the ongoing road construction. He also said that if the restoration work is carried intensively, it may likely be open for vehicles to ply within 4-5 hours.
The landslide occurred aro......